How It Works

From Factory to Your Backyard

01

Discovery Call

Tell us about your vision, your property, and your goals. A 30-minute call sets the foundation for everything that follows.

02

Design & Customization

Work with our studio team to select your model, finish package, and any optional upgrades. We sign off on a detailed spec sheet before fabrication begins.

03

Factory Build

Your unit is built in our controlled Parksville facility. Same teams, same standards, every time — typically 8 to 14 weeks depending on the model.

04

Permits & Logistics

We help coordinate permits, site prep, foundation, transport route planning, and crane access. Nothing about the install is improvised.

05

Delivery & Crane Install

Your finished unit is transported to your property and craned onto the prepared foundation. We coordinate the crane, transport, and on-site team for the lift.

06

Move In

Final utility connections — water, electrical, sewer — are handled by local trades the following week, coordinated by our team.